Click here to make tpub.com your Home Page

Page Title: Chapter 2. OPERATING INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section III. TECHNICAL PRINCIPLES OF OPERATION
Up
TM-55-4920-431-13 Auxiliary Power Unit Electronic Sequence Unit Multi-Purpose Test Set NSN 4920-01-121-0605 Manual
Next
Figure 2-1. Controls and Indicators

TM 55-4920-431-13
OPERATING INSTRUCTIONS
Section I. SERVICE UPON RECEIPT
2-1. Unpacking.  The tester is shipped in a container designed for its protection.
Three harness assemblies are provided with the tester and are stored in the lid
of the instrument case.  Unpack as follows:
Remove tester from shipping container.
a.
Remove harnesses from lid of instrument case.
b.
c.
Inspect the equipment for damage incurred during shipment. If the
equipment has been damaged, report the damage on DD Form 6, Packaging
Improvement Report.
Check the equipment against the packing slip to see if the shipment is
d.
complete.  Report all discrepancies in accordance with instructions of
TM 38-750.
Check to see whether equipment has been modified.
e.
Section II.
DESCRIPTION AND USE OF OPERATORS
CONTROLS  AND  INDICATORS
2-2.  Controls and Indicators.  Operators controls and indicators are identified in
figure 2-1 and described in table 2-1.

Privacy Statement - Press Release - Copyright Information. - Contact Us