Click here to make tpub.com your Home Page

Page Title: Table 2-2. Direct/General Support Troubleshooting - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 2-2. Direct/General Support Troubleshooting - continued
Up
TM-55-1730-229-34 Power Unit Aviation Multi-Output GTED Electrical Hydraulic Pneumatic (AGPU) Wheel Mounted Self-Propelled Towable Manual
Next
Table 2-2. Direct/General Support Troubleshooting - continued

TM 55-1730-229-34
AG 320A0-MME-000
TO 35C2-3-473-2
TM 1730-34/1
Table 2-2.
Direct/General Support Troubleshooting (continued)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
PUMP EMITS HIGH PITCH WHINE WITH LOSS OF PRESSURE AT HIGH PRESSURES (continued)
3.
Step 2.
Check HIGH PRESSURE BLEED valve:
Remove (paragraph 8-7a.) and clean valve, and clean the
a.
manifold where HIGH PRESSURE BLEED valve fits.
Inspect valve cartridge for nicks, scratches or broken
b.
packing.  Replace valve if necessary.
Replace valve packing.
c.
Re-install HIGH PRESSURE BLEED valve (paragraph 8-7.b.).
d.
Verify operation.
4.
PRESSURE GAUGE INDICATION DOES NOT DROP wHILE BLEEDING AIR.
Step 1.
Shut down complete unit and check RETURN BLEED valve for clogged
condition:
a. Remove (paragraph 8-7.a.) and clean valve and clean the
manifold where RETURN BLEED valve fits.
Inspect valve cartridge for signs of blockage (i.e., lodged
b.
bits of packing).  Replace valve cartridge if necessary.
c. Replace valve packing.
Re-install RETURN BLEED valve (paragraph 8-7.b.) and verify
d.
operation.
Step 2.
Check HIGH PRESSURE BLEED valve for clogged condition:
Remove (paragraph 8-7a.) and clean valve and clean the
a.
manifold where HIGH PRESSURE BLEED valve fits.
Inspect valve cartridge for signs of blockage (i.e., lodged
b.
bits of packing).  Replace valve cartridge if necessary.
Replace valve packing.
c*
Re-install HIGH PRESSURE BLEED valve (paragraph 8-7.b.) and
d.
verify operation.
2-5

Privacy Statement - Press Release - Copyright Information. - Contact Us