Switch Box Replacement.
Up
TM-5-6115-633-14-P Power Plant AN/MJQ-18 (NSN 6115-00-033-1398) (2) MEP-003A 10Kw 60Hz Generator Sets Manual
Next
Installation.

ARMY TM 5-6115-633-14&P
b. Installation.
(1) Position switch box (7) on fender (3).
(2) Working underneath fender (3) insert four screws (4), four flat washers (5) and four lock-
washers (6) through fender and into switch box (7) and tighten.
(3) Connect power cables (1) to load terminals on generator sets (2). (Refer to TM 5-6115-
585-12.)
4-25.
Switch Box Repair.
WARNING
Make sure generator set circuit breakers are in OFF position before performing
any repairs on switch box. Failure to observe this precaution may result in
injury or death by electrocution.
a. Load Terminal and Terminal Board Replacement. (See figure 4-10.) There are four load
terminals on the switch box terminal board. This procedure is typical for all four. When reconnecting
wires, refer to the schematic inside the switch box (figure 4-7 or 4-8, as applicable) and to the
identification bands on the wires.
Figure 4-10. Load Terminal and Terminal Board Replacement.
4-21