Click here to make tpub.com your Home Page

Page Title: Figure 3­3. Bow Assembly Replacement.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 3­2. Fitted Cover Rolled Up for Removal.
Up
TM-5-6115-633-14-P Power Plant AN/MJQ-18 (NSN 6115-00-033-1398) (2) MEP-003A 10Kw 60Hz Generator Sets Manual
Next
WARNING

ARMY TM 5-6115-633-14&P
Figure 3­3. Bow Assembly Replacement.
(2) Installation.
(a) Lift each bow (2) onto trailer, aline ends with pockets (3) in trailer body (4) and drop bow in place. Secure
each bow assembly with two quick release pins (1) provided.
(b) Install fitted cover on trailer (paragraph 3-11, a.(2)).
3-12.  Fire Extinguisher Maintenance. The AN/MJQ-18 Power Plant is equipped with two 2­3/4 lb HaIon fire
extinguishers. Maintenance is limited to weighing the fire extinguishers monthly to insure that they are sufficiently
charged. Fully charged, each fire extinguisher (with head and horn attached) weighs 5 lb. Send the unit to
specialized activity for recharging if it weighs 4 lb, 12 oz or less.
3-21