Click here to make tpub.com your Home Page

Page Title: Figure 3­2. Fitted Cover Rolled Up for Removal.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Installation.
Up
TM-5-6115-633-14-P Power Plant AN/MJQ-18 (NSN 6115-00-033-1398) (2) MEP-003A 10Kw 60Hz Generator Sets Manual
Next
Figure 3­3. Bow Assembly Replacement.

ARMY TM 5-6115-633-14&P
Figure 3­2. Fitted Cover Rolled Up for Removal.
(b) Secure fitted cover (1, figure 3-2) to bow assembly (3) with 12 straps (2) provided.
(c) Unfasten rollup straps (5, figure 3-1) securing sides of fitted cover and lower both sides (7).
(d) Unfasten rollup straps (5) securing front and rear curtains (4, 6) and lower both curtains.
(e) Secure front and rear curtains (4, 6) to sides (7) with six straps and buckles (3) provided on each curtain.
(f) Secure fitted cover to trailer body (2) with 25 ropes (1) provided.
b. B o w A s s e mbly Repla cement. (See figure 3­3.)
(1) R e m o v a l .
(a) Remove fitted cover (paragraph 3-11, a.(t)).
(b) Remove two quick release pins (1) securing each bow assembly (2) in pockets (3) on trailer body(4). Lift
each bow out of pocket and off trailer body.
Change
2
3-20

Privacy Statement - Press Release - Copyright Information. - Contact Us