Click here to make tpub.com your Home Page

Page Title: Installation.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) - continued
Up
TM-5-6115-633-14-P Power Plant AN/MJQ-18 (NSN 6115-00-033-1398) (2) MEP-003A 10Kw 60Hz Generator Sets Manual
Next
Figure 3­2. Fitted Cover Rolled Up for Removal.

ARMY TM 5-6115-633-14&P
(1) Removal.
(a)
Untie 25 ropes (1, figure 3-1) fastening fitted cover to trailer body (2).
Unfasten six straps and buckles (3) securing rear curtain (4). Roll up curtain, and
(b)
secure with three rollup straps (5) provided.
(c)
Unfasten six straps and buckles (3) securing front curtain (6). Roll up curtain, and
secure with three rollup straps (5) provided.
Roll up each side (7) of fitted cover, in turn, and secure each side with six rollup straps
(d)
(5) provided.
Working under fitted cover (1, figure 3-2), unfasten 12 straps (2) securing fitted
(e)
cover to bow assemblies (3). Remove fitted cover.
(2) Installation.
NOTE
Front curtain is provided with three tie-down ropes. Rear curtain only has two
ropes.
(a) Position fitted cover (1, figure 3-2) on top of bows (3) making certain front of fitted
cover is at front of trailer.
Figure 3-1. Fitted Cover Installed on Power Plant.
3-19

Privacy Statement - Press Release - Copyright Information. - Contact Us