Click here to make tpub.com your Home Page

Page Title: Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) - continued
Up
TM-5-6115-633-14-P Power Plant AN/MJQ-18 (NSN 6115-00-033-1398) (2) MEP-003A 10Kw 60Hz Generator Sets Manual
Next
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) - continued

ARMY TM 5-6115-633-14&P
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) - CONT.
D ­ During
B - Before
A - After
W ­ Weekly
M ­ Monthly
Item to be inspected.
Interval
Procedure: check for and
have repaired, filled, or
Item
Equipment is not
no.
adjusted as needed
ready/available if:
19
BRAKE SYSTEM
q
Test brake system by hooking trailer
Service brakes fail to
to towing vehicle and applying brakes.
operate.
TRAILER OPERATION
20
q
a. Be alert for any unusual noises while
towing trailer. Stop and investigate
any unusual noises.
b. Ensure that trailer is tracking/following
correctly behind towing vehicle with no
side pull.
21
GENERATOR SET GAGES AND INSTRUMENTS
q
a.
Check that battery indicator (26)
Battery indicator not
is in yellow area while batteries
in correct area.
are charging and in green area when
batteries are fully charged.
Check that frequency meter (27)
b.
Correct frequency
i n d i c a t e s 60 Hz (red line) when
c a n n o t be obtained
generator is operating under load.
and  maintained.
3-13

Privacy Statement - Press Release - Copyright Information. - Contact Us