Click here to make tpub.com your Home Page

Page Title: Chapter 4. GENERAL SUPPORT TESTING PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Adjustment of Maximum Output Voltage
Up
TM-11-6625-617-45 Power Supply PP-3514/U Manual
Next
Figure 4-1. Volatge Regulation test connections

GENERAL SUPPORT TESTING PROCEDURES
quired to perform the testing procedures given
4-1. General
in this section are listed in the following chart
a. Testing procedures are prepared for use
and are authorized under TA 11-17, Signal
by Signal Field Maintenance Shops and Signal
Field Maintenance Shops, and TA 11-100(11-
Service Organizations responsible for general
17), Allowances of Signal Corps Expendable
support maintenance of electronic equipment
Supplies for Signal Field Maintenance Shop,
to determine the acceptability of repaired
Continental United States.
equipment These procedures set forth specif-
a. Test Equipment.
ic requirements that repaired equipment must
meet before it is returned to the using organi-
zation. These procedures may also be used as
a guide for testing equipment that has been
repaired at the direct support level if the prop-
er tools and test equipment are available. A
b. Other Equipment.
summary of the performance standards is giv-
(1) Switch, toggle, SPST.
(2) Battery, 45-volt.
(3) Resistor, 1,000-ohm.
b. Comply with the instructions preceding
(4) Resistor, 1,500-ohm.
each chart before proceeding to the chart. Per-
(5) Potentiometer, 5,000-ohm.
form each step in sequence. Do not vary the
(6) Resistor, 200-ohm.
sequence. For each step, perform all the ac-
tions required in the Control settings columns;
4-3. Physical Tests and Inspections
then perform each specific test procedure and
a. Test Equipment and Materials. None re-
verify it against its performance standard.
quired.
b. Test Connections and Conditions. No con-
4-2. Test Equipment and Other Materials
nections necessary.
All test equipment and other equipment re-
c. Procedure.
.

Privacy Statement - Press Release - Copyright Information. - Contact Us