Preregulator Voltage Adj Potentiometer A5-R9.
Up
TM-11-6130-266-15 Power Supply PP-6224/U Manual
Next
Output Range Test

TM 11-6130-266-15
CHAPTER 6
GENERAL SUPPORT TESTING PROCEDURES
a. Test Equipment.
6-1. General
a. Test procedures are prepared for use by
Electronics Field Maintenance Shops and Electronic
Service Organizations responsible for general support
(1) Digital, Voltmeter AN/GSM-64.
maintenance of electronic equipment to determine the
acceptability of repaired equipment. These procedures
(2) Voltmeter, Meter ME-30A/V.
set forth specific requirements that repaired equipment
must meet before it is returned to the using organization.
(3) Multimeter, Weston Instruments Model
A summary of the performance standards is given in
281.
(4) Multimeter TS-352B/U.
b. Comply with the instructions preceding each
chart before proceeding to the chart. Perform each step
b. Tools. The only tools necessary for these
in sequence. Do not vary the sequence. For each step,
checks are those contained in Tool Kit, Electronic
perform all the actions required in the Control settings
Equipment TK-100/G.
column; then perform each specific test procedure and
verify it against its performance standard.
c. Other Equipment .
(1) Transformer Variable TF-171A.
6-2. Test Equipment, Tools, and Materials
(2) Simulator, Battery Variable Load Bank
NOTE
(FMC63743, Type K48149).
Use tools and test equipment listed
(3) Connector, Electrical, 2 required
below until the tools and test
(FSN 5935-921-3398).
equipment listed in Appendix A
become available.
6-3. Physical Tests and Inspection
All test equipment, tools, materials, and other equipment
required to perform the test procedures given in this
a. Test Equipment and Materials. None required.
chapter are listed in a, b and c below.
b. Test Connections and Conditions.
(1) No connections necessary.
(2) Remove panels and covers as necessary
for visual and actual access to all components.
Change 3 6-1