Click here to make tpub.com your Home Page

Page Title: Chapter 2. INSTALLATION AND OPERATING INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 1-2. Power Supply PP-622 /U, power cords.
Up
TM-11-6130-266-15 Power Supply PP-6224/U Manual
Next
Section II. OPERATING INSTRUCTIONS

TM 11-6130-266-15
CHAPTER 2
INSTALLATION AND OPERATING INSTRUCTIONS
Section I. INSTALLATION
(2) Check to see that the equipment is
2-1. Packaging Data
complete as listed on the packing slip. If a packing slip
When packaged for shipment, the power supply is
is not available, check the equipment against the chart in
packed as follows:
paragraph 1-6. Report all discrepancies in accordance
with TM 38-750. Shortage of a minor assembly or part
a. The power supply is fastened to a plywood
that does not affect proper functioning of the equipment
sheet by bolts and nuts at each corner.
should not prevent use of the equipment.
b. The ac and dc.  power cords are placed in a
sealed plastic bag and packed behind the power supply.
c. The power supply, technical manual, and cords
are placed in the fiberboard box and enclosed by a
sleeve.
d. A top pad is placed over the equipment, then the
two sealed bags are placed on the pad.
e. The box is now closed and taped at all four
corners.
2-2. Unpacking and Checking
a. Unpacking.
To unpack the power supply
(fig. 2-1), proceed as follows:
(1) Cut the tape sealing the top of the
fiberboard box and fold back the flaps.
(2) Remove the manual bag.
(3) Remove the top pad.
(4) Lift out the ac and de power cords.
(5) Cut the tape at the four corners of the box
and fold back each side of the box until the four
fastening bolts are accessible.
(6) Remove  the  sleeve  from  the  power
supply.
(7) Remove the nuts and bolts that secure the
power supply to the plywood.
(8) Lift the power supply off the plywood and
place it in an area for easy checking.
b. Checking.
(1) Inspect  the  equipment  for  damage
incurred during shipment.  If the equipment has been
damaged, report the damage on DD Form 6 (para 1-3).
Figure 2-1. Power Supply PP-6224/ U, typical
packaging.
2-1

Privacy Statement - Press Release - Copyright Information. - Contact Us