Click here to make tpub.com your Home Page

Page Title: Insulation Resistance Test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Power Output, Regulation, and Ripple Tests at 220-Volt Input
Up
TM-11-6130-243-35-1 Power Supply PP-4606A/G Manual
Next
Figure 3­1. Connection diagram for power output, regulation, and ripple tests at 220-volt input.

TM 11­6130­243­35­1
c. Procedure.
3­5. Insulation Resistance Test
(1) Connect the ZM-21A/U ground lead
a. Test Equipment. The only test equipment
to the PP-4606A/G frame.
required is Ohmmeter ZM-21A/U.
(2) Connect the ZM-21A/U line lead to
b. Test Connections and Conditions. This
any terminal of the primary wind-
test is performed with the PP-4606A/G dis-
ings of T1, T2, and T3.
connected from the ac power source, and is
used to check the insulation resistance of the
(3) Operate the ZM-21A/U and observe
primary windings of power transformers T1,
t h e indication on the ZM-21A/U
meter. The PP-4606A/U meets the
T2, and T3. The test is written for the PP-
performance standard if the ZM-21
4606A/G connected for 220-volt ac operation.

Privacy Statement - Press Release - Copyright Information. - Contact Us