Click here to make tpub.com your Home Page

Page Title: Chapter 3. GENERAL SUPPORT TESTING PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-2. Power Supply PP-4606A/G, parts location.
Up
TM-11-6130-243-35-1 Power Supply PP-4606A/G Manual
Next
Power Output, Regulation, and Ripple Tests at 220-Volt Input

TM 11-6130-243-35-1
GENERAL SUPPORT TESTING PROCEDURES
a. Test Equipment.
3-1. General
a. Testing procedures are prepared for use
by Signal Field Maintenance Shops and Signal
Service Organizations responsible for general
support maintenance of electronics equipment
to determine the acceptability of repaired
TM
11­6625­366-15
equipment. These procedures set forth specific
requirements that repaired equipment must
None
meet before it is returned to the using organi-
zation. These procedures may also be used as
TM
11-6625-320­12
a guide for testing equipment that has been
repaired at direct support, if the proper tools
TM
11­2050
and test equipments are available. A summary
of the performance standards is given in para-
b. Tools. All the tools required are included
b. Comply with the instructions preceding
in Tool Kits, Electronic Equipment TK-100/
each chart before proceeding to the chart. Per-
G and TK-105/G.
form each step in sequence. Do not vary the
c. Materials
sequence. For each step, perform all the actions
required in the Control settings column; then
perform each specific test procedure and verify
it against its performance standard.
3-2. Test Equipment, Tools, and Materials
All test equipment, tools, and materials re-
3-3. Physical Tests and Inspections
quired to perform the testing procedures given
in this chapter are listed in a, b, and c below
Test Equipment and Materials. None re-
and are authorized under TA 11-17, Signal
quired.
Field Maintenance Shops; and TA 11-100 (11-
b. Test Connections and Conditions.
con-
17), Allowances of Signal Corps Expendable
nections are necessary. Remove power supply
Supplies for Signal Field Maintenance Shops.
side panels.
left and

Privacy Statement - Press Release - Copyright Information. - Contact Us