Page Title: 220-Volt, Three-Phase 60 Hz Power Connections
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-2. Power Supply PP-4606B/G, controls and indicators.
Up
TM-11-6130-243-14-2 Power Supply PP-4606B/G (NSN6130-00-504-0327) Manual
Next
Section Il. OPERATION

TM 11-6130-243-14-2
a.  220-Volt, Three-Phase 60 Hz Power Connections
(b) Connect lead T2 to terminal 12 of phase B
(TB2) and to terminal T2-C of CB1.
(1) Connect lead T1 to terminal 11 of phase A
(c) Connect lead T3 to terminal 12 of phase C
(TB3) and to terminal T3-C of CB1.
(TB1), and to terminal T1-C of CB1.
(2) Connect lead T2 to terminal 11  of phase B
(d) Using the six power transformer jumpers
that are supplied, connect a jumper between terminal 1
(TB2) and to terminal T2-C of CB1.
(3) Connect lead T3 to terminal 11 of phase C
and terminal 7; and a jumper between terminal 6 and
terminal 12 of phase A (TB1), phase B (TB2), and phase
(TB3) and to terminal T3-C CB1.
(4) Using thc six power transformer jumpers that
C (TB3).
(e) Connect terminal 1 of phase A (TB1) to ter-
are supplied, connect a jumper between terminal 1 and
minal 1 of phase B (TB2) and terminal 1 of phase C
terminal 7; and a jumper between terminal 5 and
terminal 11 of phase A (TB1), phase B (TB2), and phase
(TB3) to terminal 1 of phase B (TB2).
(3) 396-volt,  three phase, 60 Hz input (fig.
C (TB3).
(5) Connect terminal 1 of phase A (TB1) to
FO-1, D).
(a) Connect lead T1 to terminal 10 of phase A
terminal 1 of phase B (TB2) and terminal 1 of phase C
(TB3) to terminal 1 of phase B (TB2).
(TB1) and to terminal T1-B of CB1.
(b) Connect lead T-2 to terminal 10 of phase B
b. 440-Volt, Three-Phase 60Hz Power Connections
(TB2) and to terminal T2-B of CB1.
(1) Connect lead T1 to terminal 11 of phase A
(c) Connect lead T3 to terminal 10 of phase C
(TB1) and to terminal T1-B of CB1.
(T133) and to terminal T3-B of CB1.
(d) Using the six power transformer leads that
(2) Connect lead T2 to terminal 11 of phase B
(TB2) and to terminal T2-B of CB1.
are supplied, connect a pair of jumpers between ter-
minal 4 and terminal 7 of phase A (TB1), phase B
(3) Connect lead 1-3 to terminal 11 of phase C
(TB3) and to terminal T3-B of CB1.
(TB2), and phase C (TB3).
(c) Connect terminal 1 of phase A (TB1) to ter-
(4} Using the six power transformer jumpers that
minal 1 of phase B (TB2) and terminal 1 of phase C
are supplied, connect a pair of jumpers between
terminal 5 and terminal 7 of phase A (TB1), phase B
(TB3) to terminal 1 of phase B (TB2).
(TB2), and phase C (TB3).
(4) 484-volt, three phase, 60 Hz input (fig.
(5) Conncct terminal 1 of phase A (TB1) 10 ter-
FO-1, F).
minal 1 of phase B (TB2) and terminal 1 of phase C
(a) Connect lead T1 to terminal 12 of phase A
(TB1) and to terminal T1-B of CB1.
(TB3) to terminal 1 of phase B (TB2).
c. Input Power Cable Connection. Connect the
(b) Connect lead T2 to terminal 12 of phase B
four-wire input power cable to the ac power input
(TB2) and to terminal T2-B of CB1.
source (green wire is ground).
(c) Connect lead T3 to terminal 12 of phase C
d. Course Tap Adjustment. The following pro-
(TB33) and to terminal T3-B of CB1.
cedures are provided for input power facilities that vary
(d) Using the six power transformer leads that
from standard 220 or 440, three phase, 60 Hz voltages.
are supplied, connect a pair of jumpers between ter-
(1) 198-volt, three phase, 60 Hz input (fig.
minal 6 and terminal 7 of phase A (TB1), phase B
FO-1, A).
(TB2), and phase C (TB3).
(a) Connect lead T1 to Terminal 10 of phase A
(e) Connect terminal 1 of phase A (TB1) to ter-
minal 1 of phase B (TB2) and terminal 1 of phase C
(TB1) and to terminal T1-C of CB1.
(b) Connect lead T2 to terminal 10 of phase B
(TB3) to terminal 1 of phase B (TB2).
(TB2) and to terminal T2-C of CB1.
e. Fine Tap Adjustment To Raise Output Voltage.
(c) Connect lead T3 to terminal 10 of phase C
If the output voltage is lower than the nominal 28 volts
(TB3) and to terminal T3-C of CB1.
dc and it is necesary to have a higher output voltage,
(d) Using the six power transformer jumpers
change the taps on TB1, TB2, and TB3 as follows:
that are supplied, connect a jumper between terminal 1
Move all taps connected to the fine tap terminals to the
and terminal 7; and a jumper between terminal 4 and
next higher number.
Example.
terminal 10 of phase A (TB1), phase B (TB2), and phase
To raise the output voltage when connected for
C (TB3).
(e) Connect terminal 1 of phase A (TB1) to
198-volt connection as shown in figure FO-1, A; change
terminal 1 of phase B (TB2) and terminal 1 of phase C
the fine tap connections as follows:
(TB3) to terminal of phase B (TB2).
(1)  Move tap connected to terminal 7 of phase A
(TB1) to terminal 8 of TB1.
(2) 242-volt, three phase, 60 Hz input (fig.
FO-1,C).
(2)  Move tap connected to terminal 7 of phase B
(a) Connect lead T1 to terminal 12 of phase A
(TB1) and to terminal T1-C of CB1.
2-3
Change 1