Click here to make tpub.com your Home Page

Page Title: Chapter 3. MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
FILAMENT REGULATORS
Up
TM-11-5820-921-40-1 Power Amplifier AM-6545A/GRC-193A (NSN 5820-01-186-3699) Manual
Next
Figure 3-1. Special Setup For testing Power Amplifier

TM 11-5820-921-40-1
MAINTENANCE INSTRUCTIONS
SECTION I
INTRODUCTION
NOTE
Maintenance Kit OA-9163/GRC-l93A is available as a Maintenance Test Bed.
INTRODUCTION
This chapter describes the intermediate maintenance effort applicable to the power amplifier.
3-2.
Included herein are maintenance scheduling, tools and equipment, safety precautions, disassembly and
assembly, inspection, and various troubleshooting, alignment, and adjustment data for the power amplifier.
Tabular data, illustrations, and references to the theoretical explanations of chapter 2 are included to aid
the technician in a complete understanding of the procedures and equipment.
This chapter is arranged such that the troubleshooting and field maintenance sections are integrated
3-3.
with one another. The maintenance procedures contained in this chapter use input and output signals,
switching and control, and power sources provided by various components of Radio Set AN/GRC-193, of
which Power Amplifier AM-6545/GRC-193 is a component. If it is desired to test the power amplifier not
using Radio Set AN/GRC-193 as a test standard, the inputs and outputs can be duplicated using laboratory
equipment. Refer to figure 3-1 for specific details.
SCHEDULED MAINTENANCE ACTION INDEX
Table 3-1 lists procedures, applicable paragraph references, and the frequencies of performance
3-5.
for all maintenance instructions (inspection, repair, adjustments, etc.) contained in this chapter.
SECTION II
TOOLS AND EQUIPMENT
TOOLS, CLEANING SOLVENTS, LUBRICANTS, AND OTHER CONSUMABLE SUPPLIES
Tables 3-2 and 3-5 list the tools, cleaning solvents, lubricants, and other consumable supplies,
3-7.
respectively, needed for maintenance of the power amplifier.
MAINTENANCE RECORDS AND REPORT FORMS
3-9.
See paragraph O-3 for maintenance, records and reports.
3-10. SERVICE REQUIREMENTS PRIOR TO, DURING AND AFTER OPERATION
3-11. To ensure that the equipment is ready for operation at all times, it must be inspected systematically
before operation, during operation, and after operation, so that defects may be discovered and corrected
before they result in serious damage or failure. The necessary preventive maintenance procedures will be
performed before operation. Defects discovered during operation of the unit will be noted for future
correction, to be made as soon as operation has ceased. Stop operation immediately if a deficiency is
3-1/(3-2 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us