Click here to make tpub.com your Home Page

Page Title: Section Il. REPAIR
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 3-2. Power Supply PP-1209C/FG, Order No. 10437-PP-61-C2-C2, wiring diagram
Up
TM-11-5805-239-35 Power Supplies PP-1209/FG PP-1209A/FG PP-1209B/FG and PP-1209C/FG Manual
Next
Chapter 4. GENERAL SUPPORT TESTING PROCEDURES

TM 11-5805-239-35
Section Il. REPAIR
a. Capacitor C1 is an electrolytic capacitor;
3-7. General Parts Replacement
proper polarity must be observed when plac-
Techniques
ing it into a circuit.
b. When replacing rectifier CR1, observe
Most of the parts of Power Supply PP-
the polarity. (The end with the positive mark-
can  b e reached and replaced
1209(*)/FG
ing is the semiconductor cathode.)
without special procedures. Whenever a part
c. Use a pencil-type soldering iron when
has been removed or any wires have been dis-
soldering or unsoldering the component parts.
connected, refer to the appropriate wiring dia-
W h e n the repair is completed, restore all
g r a m when making reconnection. See that
wires to their original dress.
all fastenings are replaced securely. After a
3-8. Testing Repaired Equipment
repair has been completed, test the equipment
(para 3-8) before returning it to service. The
Repaired equipment should be tested for
following precautions apply specifically to this
proper operation. Refer to paragraph 4-6 for
the PP­1209 (*)/FG test procedure.
power supply.
3-7

Privacy Statement - Press Release - Copyright Information. - Contact Us