Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION V. UNIT TROUBLESHOOTING
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Unit Preventive Maintenance Checks and Services - Continued
Up
TM-5-3610-295-13P-2 Printing Plant Special Warfare Transportable - Press Shelter Manual
Next
TABLE 4-3.  UNIT TROUBLESHOOTING

TM 5-3610-295-13&P-2 SECTION V.  UNIT TROUBLESHOOTING 4-9. GENERAL.      This   section   contains   unit   troubleshooting   information   for   locating   and   correcting   common malfunctions which may develop in the press shelter. WARNING The     press     contains     voltages     that     are     dangerous     if     contacted.          When troubleshooting, observe all safety warnings and precautions.  Make sure power is disconnected before replacing or repairing electrical components.  Failure to do so may result in serious electrical shock or death. If you suspect a press shelter problem, you should first verify that the PRESTART PROCEDURE in paragraph 2-8 had been   performed   before   continuing   with   UNIT   TROUBLESHOOTING   in   table   4-3.      This   manual   cannot   list   all malfunctions that may occur, nor all tests or inspections and corrective actions possible.  If a malfunction is not listed or not corrected by listed corrective actions in this manual, then refer to commercial or Technical Manual.  If at this point you cannot correct the malfunction, notify your supervisor. 4-10. UNIT TROUBLESHOOTING.  Table 4-3 lists the common malfunctions which you may find during operation or maintenance of the press shelter or its components.  You should perform the tests or inspections and corrective actions in the order listed. NOTE Before you use this table, be sure you have performed all applicable Operator and Unite Preventive Maintenance Checks and Services (PMCS). 4-13

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing