|
| |
Back SECTION II. REPAIR PARTS, SPECIAL TOOLS, TEST MEASUREMENT AND DIAGNOSTIC EQUIPMENT (TMDE), AND SUPPORT EQUIPMENT | Up TM-5-3610-295-13P-2 Printing Plant Special Warfare Transportable - Press Shelter Manual | Next SECTION IV. UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) |
TM 5-3610-295-13&P-2
SECTION III. SERVICE UPON RECEIPT OF EQUIPMENT
4-5.
SETUP OF SHELTER. Refer to Chapter 2, paragraph 2-8 for setup procedures.
4-6.
SHELTER INVENTORY CHECK. Refer to TM-10-5411-207-14 for general shelter inventory checks.
4-7.
PRESS SHELTER INSPECTION CHECKLIST.
a.
Shelter Checklist. Refer to TM-10-5411-207-14 for shelter inspection checklist.
b. Press Shelter Checklist. Table 4-1 below lists items in the Press Shelter that must be checked and the action
required.
Table 4-1. Press Shelter Checklist
ITEM
ACTION
1.
Duplicator
Check housing and operator controls and indicators for damage.
2.
Color Press
Inspect Housing, rollers and operator controls and indicators for damage.
3.
Papercutter
Check housing and operator controls and indicators for damage.
4. Air Conditioner
Check controls and indicators for damage.
4-5/(4-6 Blank)
|