Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR MOVEMENT AND STORAGE. - Continued.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
2-9.  PREPARATION FOR MOVEMENT AND STORAGE
Up
TM-5-3610-295-13P-2 Printing Plant Special Warfare Transportable - Press Shelter Manual
Next
Figure 2-6.  Operating Instructions on Decals and Data Plates

TM 5-3610-295-13&P-2 2-9. PREPARATION FOR MOVEMENT AND STORAGE. - Continued. b. Shutdown Procedures. WARNING DEATH  or  serious  injury  could  result  if  electrical  precautions  are  not  taken when  maintaining  this  equipment.  Be  sure  that  power  cables  are  unplugged/ disconnected,  that  circuit  breakers  are  set  to  OFF  and  that  generator  cables are  unplugged/disconnected.  Be  sure  that  the  generator/commercial  power system is properly grounded. Always have another person standing by who is familiar with electrical shock first aid. (1) Set all equipment and shelter power switches to the off or neutral position. (2) Set all circuit breakers in the main power service box to OFF. (3) Notify Module C supervisor to set commercial power breaker to OFF or shut down the generator set power source in accordance with the applicable Department of the Army Technical Manual. (4) Disconnect the main power cable from the generator power source. (5) Disconnect the cable from the main power receptacle. (6) Coil and correctly stow main power cable. 2-17

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing