Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ASSEMBLY AND PREPARATION FOR USE. - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
2-8.   ASSEMBLY AND PREPARATION FOR USE.  - Continued
Up
TM-5-3610-295-13P-2 Printing Plant Special Warfare Transportable - Press Shelter Manual
Next
2-9.  PREPARATION FOR MOVEMENT AND STORAGE

TM 5-3610-295-13&P-2 2-8.   ASSEMBLY AND PREPARATION FOR USE.  - Continued k.  Setting Up 15 KW Generator and Connecting Main Power Cable.  - Continued (2)        Connect  the  leads  of  the  6  foot  power  cable  to  the  generator  in  accordance  with  the following color code: L1 - black - Pin 1 L2 - red - Pin 3 Ground - green - Pin 4 (marked with blue band) LO - white - Pin 2 1.      Setting   up   Equipment.      Plug   the   power   cords   of   the   individual   items   of   equipment   into   the   wall receptacles  located  near  their  operating  positions.    Specialized  pre-operating  instructions  for  individual  items  of equipment,  where  necessary,  will  be  found  in  the  respective  technical/commercial  equipment  manuals  provided with the shelter. m.  Prestart Procedure. NOTE Power to the shelter unit can be provided by commercial power or portable generator set. (1)    Set all circuit breakers in main power service box to OFF position. WARNING DEATH     or     serious     injury     could     result     if     electrical precautions are not taken when maintaining this equipment. Be sure that power cables are unplugged/disconnected,   that   circuit   breakers   are   set   to OFF and that generator cables are unplugged/disconnected. Be sure that the generator/commercial power system is property grounded. Always  have  another  person  standing  by  who  is  familiar with electrical shock first aid. (2)    Connect the main power cable to the main power receptacle located near the door of the shelter, prior to connecting the cable to the power source.  The cable connector and the receptacles are keyed to ensure proper connection. (3)    If setting up the Press Shelter for use with the Modular Printing System (MPS), refer to TM 5-3610-294- 13&P for connection of the power cable to the power distribution box. (4)    Notify Module C supervisor that electrical connections are complete and power is required. n.  Start Procedure.  Starting the System. (1)    Set all circuit breakers in the main power service box to ON. 2-15

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing