Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-8. ASSEMBLY AND PREPARATION FOR USE. - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-4. Removing Air Conditioner Covers
Up
TM-5-3610-295-13P-2 Printing Plant Special Warfare Transportable - Press Shelter Manual
Next
ASSEMBLY AND PREPARATION FOR USE.  - Continued

TM 5-3610-295-13&P-2 2-8.   ASSEMBLY AND PREPARATION FOR USE.  - Continued j.  Filling Water Tank. (1)    Connect hose to water tank connection on roadside exterior wall of shelter. (2) Connect other end of hose to water source and fill water tank. (3) Disconnect and stow hose. k.  Setting Up 15 KW Generator and Connecting Main Power Cable. WARNING DEATH     or     serious     injury     could     result     if     electrical precautions are not taken when maintaining this equipment.      Be   sure   that   power   cables   are   unplugged/ disconnected, that circuit breakers are set to OFF and that generator cables are unplugged/disconnected.  Be sure the equipment   is   properly   grounded.      Always   have   another person  standing  by  who  is  familiar  with  electrical  shock first aid. (1)    Setting Up Generator. (a) Set all circuit breakers in main power service box to OFF. (b) Install ground rod and connect ground wire to ground rod and shelter grounding point. (c) Refer to generator TM 5-6115-464-12 for instruction on installation and operation of the generator. WARNING When  used  in  conjunction  with  Modular  Print  System,  only the  Modular  C  supervisor  is  authorized  to  operate  controls on   the   Power   Distribution   Box.      Failure   to   follow   these procedures can cause serious injury or DEATH. (d)    Connecting Main Power Cable to Shelter.  Connect the 50 foot main power cable to the input power receptacle located near door of shelter prior to connecting cable to power source.  Connect 6 foot pigtail connector to 50 foot power cable. (1) The cable connector and receptacle are keyed to ensure proper connection. 2-14

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing