Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-3. Installing Boarding Ladder
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
SECTION III.  OPERATION UNDER USUAL CONDITIONS
Up
TM-5-3610-295-13P-2 Printing Plant Special Warfare Transportable - Press Shelter Manual
Next
Figure 2-4. Removing Air Conditioner Covers

TM 5-3610-295-13&P-2 2-8. ASSEMBLY AND PREPARATION FOR USE. - Continued e. Checking Unpackaged Equipment. - Continued (2) Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in accordance with the instructions of DA Pam 738-750. f.   Installation Instructions. The Press Shelter is installed for operation on the bed of a 2-1/2 ton cargo truck. The individual items of equipment in the Press Shelter are usually transported intact in their operating position and no installation procedures are deemed necessary. g.    Installing Boarding Ladder. NOTE This procedure is performed only if the shelter is to remain on the truck bed for operation. (1) Unbuckle ladder mounting strap (1). (2) Lift ladder (2) from mounting (3) on exterior wall. (3) Insert holding brackets (4) on edge of tailgate (5). (4) Attach hooks (6) of ladder stabilizers to underside lip of truck bed. Figure 2-3. Installing Boarding Ladder 2-12

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing