Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR MOVEMENT AND STORAGE. - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
PREPARATION FOR MOVEMENT AND STORAGE.  - Continued
Up
TM-5-3610-295-13P-1 Editorial and Photochemical Shelter Manual
Next
PREPARATION FOR MOVEMENT AND STORAGE.  - Continued

TM 5-3610-295-13&P-1 2-15. PREPARATION FOR MOVEMENT AND STORAGE.  - Continued a. Preparing Shelter for Movement.  - Continued (28) Install and secure the air conditioner covers. (29) Close and secure shelter door. (30) Cover all shelter apertures with pressure sensitive tape. (31) Stow and secure ladder. (32) Apply a preservative compound (item 29, app E) to all unfinished metal surfaces of the various pieces of equipment when shelter is to be stored for an extended period of time. b. Shutdown Procedures. WARNING DEATH or serious injury could result if electrical precautions are not taken when maintaining    this    equipment.        Be    sure    that    power    cables    are    unplugged/ disconnected,  that  circuit  breakers  are  set  to  OFF  and  that  generator  cables  are unplugged/disconnected.  Be sure that the generator/commercial power system is properly grounded.  Always have another person standing by who is familiar with electrical shock first aid. (1) Set all equipment and shelter power switches to the off or neutral position. (2) Set all circuit breakers in the main power service box to OFF. NOTE When   used   in   conjunction   with   Modular   Print   System,   to   ensure   safety   of operator, power to circuit breaker is controlled by Module C supervisor. (3) Set commercial power breaker to OFF or shut down the 60 kW power plant in accordance with TM 5- 6115-594-14&P or TM 5-6115-625-14&P. (4) Disconnect the main power cable from the generator power source. (5) Disconnect the cable from the main power receptacle. 2-26

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing