Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ASSEMBLY AND PREPARATION FOR USE. - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
ASSEMBLY AND PREPARATION FOR USE.  - Continued
Up
TM-5-3610-295-13P-1 Editorial and Photochemical Shelter Manual
Next
Figure 2-11.  Installing Drain Hose

TM 5-3610-295-13&P-1 2-14. ASSEMBLY AND PREPARATION FOR USE.  - Continued d. Unpacking.  - Continued NOTE Many pieces of equipment are modified to include shipping brackets, holddown brackets, or thumbscrews.  These devices are used to secure fragile or loosely mounted  items  such  as  the  glass  tops  of  the  light  tables.    These  devices  are painted bright red and are not to be discarded during unpacking.  These devices will be used each time the shelter is moved to a new work site. (3) Remove tiedown straps which secure smaller items of equipment inside shelter. (4) Remove paper or other packing material from cables, etc. WARNING DEATH  or  serious  injury  could  result  by  repeated  and/or  prolonged  breathing and/or  skin  contact  of  drycleaning  solvent  P-D-680.    Use  in  a  well-ventilated area.  Do not use near open flame or in excessive heat.  The flash point of this solvent is 100 °F - 138 °F (38 °C - 59 °C). (5) Remove preservative compound from all unfinished metal surfaces with drycleaning solvent (item 17, app E). e. Checking Unpackaged Equipment. (1) Inspect  the  equipment  for  damage  incurred  during  shipment.    If  the  equipment  has  been  damaged, report the damage on DD Form 6, Packaging Improvement Report. (2) Check   the   equipment   against   the   packing   slip   to   see   if   the   shipment   is   complete.      Report   all discrepancies in accordance with the instructions of DA Pam 718-750. f. Installation Instructions.  The Editorial Shelter is installed for operation on the bed of a 2 1/2 ton cargo truck. The interior items of equipment in the Editorial Shelter are usually transported intact in their operating positions and no installation procedures are deemed necessary.  Several exterior items must be installed as described below. 2-18

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing