Click here to make tpub.com your Home Page

Page Title: Table 3-1. Operator Troubleshooting
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SECTION II. TROUBLESHOOTING PROCEDURES
Up
TM-5-3610-295-13-P-1 Printing Plant Special Warfare Transportable NSN: 3610-01-106-2276 Editorial and Photochemical Shelter NSN: 3610-01-165-5688 Manual
Next
Table 3-1. Operator Troubleshooting - Continued

TM 5-3610-295-13&P-1
3-3. GENERAL. - Continued
Table 3-1. Operator Troubleshooting
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
1. NO ELECTRICAL POWER TO SHELTER SYSTEM.
WARNING
The 15 KW generator must be shut down or the main circuit breaker on power distribution
box must be in the OFF position before connecting main power cable. Failure to do so
may result in DEATH or serious injury.
When used with the Modular Printing System, to ensure safety of operator, only the
Module C supervisor is authorized to operate controls of the power distribution box.
CAUTION
Connect the primary power cable to the input power receptacle located near the door of the
shelter. The cable connector and the receptacles are keyed to ensure proper connection.
Step 1. Check that the main power cable is correctly connected at main power receptacle.
Step 2. When used with the Modular Printing System, check to see if the main power cable is properly connected
at power distribution box. Request Module C supervisor verily connection and operation of the power
distribution box.
Step 3. Inspect to see that the generator is operating properly.
Start the 15 KW power plant in accordance with TM 5-6115-464-14&P or TM 5-6115-625-14&P