Click here to make tpub.com your Home Page

Page Title: Loading Shelter
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-15. Loading Shelter
Up
TM-5-3610-295-13-P-1 Printing Plant Special Warfare Transportable NSN: 3610-01-106-2276 Editorial and Photochemical Shelter NSN: 3610-01-165-5688 Manual
Next
Securing Shelter

TM 5-3610-295-13&P-1
2-15.
PREPARATION FOR MOVEMENT AND STORAGE. - Continued
c.
Loading Shelter. - Continued
(6)
Position truck under shelter and slowly lower it onto truck using towing eye rope to help guide it into
position.
(7)
Remove lifting ring from lifting hook., Disassemble lifting ring and sling hooks. Remove sling center
hooks from the lifting eyes. Remove rope from rear towing eyes.
d.
Securing Shelter. (See figure 2-16.)
(1)
Install tiedown ring assembly above the center support on the cargo bed siderail of the truck.
(2)
Use the hook at the farthest end from turnbuckle and hook each end of the sling assemblies to a
tiedown eye of the shelter.
(3)
Secure sling hooks to tiedown ring.
CAUTION
Lifting eye assemblies can be damaged if turnbuckles are over tightened.
(4)
Tighten turnbuckles hand tight, then turn each turnbuckle an additional one-half turn using a bar or rod
inserted in the turnbuckle slot.
(5)
Insert wooden blocks between shelter skids and side of truck bed.
(6)
Insert wooden blocks between shelter skids and cab wall.
2-29

Privacy Statement - Press Release - Copyright Information. - Contact Us