Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR MOVEMENT AND STORAGE.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ASSEMBLY AND PREPARATION FOR USE - continued
Up
TM-5-3610-295-13-P-1 Printing Plant Special Warfare Transportable NSN: 3610-01-106-2276 Editorial and Photochemical Shelter NSN: 3610-01-165-5688 Manual
Next
Preparing Shelter for Movement

TM 5-3610-295-13&P-1
2-14
ASSEMBLY AND PREPARATION FOR USE. - Continued
j.
Start Procedure. Starting the System.
NOTE
When used in conjunction with Modular Print System, to ensure safety of
operator, power to circuit breaker is controlled by Module C supervisor.
(1)
Set commercial power breaker to ON or start the 60 kW power plant in accordance with TM 5-6115-
594-14&P.
(2)
Set all circuit breakers in the main power service box to ON.
(3)
Set fluorescent light switches to on.
(4)
Set the air conditioner controls for the desired mode of operation temperature setting.
PREPARATION FOR MOVEMENT AND STORAGE.
a.
Preparing Shelter for Movement.
(1)
Secure all expendable materials and supplies. Stow all loose supplies.
(2)
Secure telephone in telephone bracket with shipping clamp.
(3)
Secure red shipping bracket to top of light table.
(4)
Be sure lock bar is installed in historical file cabinet.
(5)
Secure folding artist shelves in upright position with red shipping brackets.
(6)
Close and secure wall cabinet and artist supply cabinet doors.
(7)
Secure stools under light table shelves with straps.
(8)
Prepare camera for shipping by doing the following:
(a)
Install red holddown bars on copyboard.
(b)
Move lenseboard up with bellows compressed.
(c)
Close and secure top of camera.
2-24

Privacy Statement - Press Release - Copyright Information. - Contact Us