Click here to make tpub.com your Home Page

Page Title: ASSEMBLY AND PREPARATION FOR USE - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ASSEMBLY AND PREPARATION FOR USE - continued
Up
TM-5-3610-295-13-P-1 Printing Plant Special Warfare Transportable NSN: 3610-01-106-2276 Editorial and Photochemical Shelter NSN: 3610-01-165-5688 Manual
Next
PREPARATION FOR MOVEMENT AND STORAGE.

TM 5-3610-295-13&P-1
2-14. ASSEMBLY AND PREPARATION FOR USE. - Continued
g.
Setting Up 15 KW Generator and Connecting Main Power Cable. - Continued
2
Connect the leads of the 6 foot power cable to the generator in accordance with the following
color code:
L1 - black - Pin 1
L2 - red - Pin 3
Ground - green - Pin 4 (marked with blue band)
LO - white - Pin 2
h.
Setting up Equipment. Plug the power cords of the individual items of equipment into the wall receptacles
provided near their operating positions. Specialized preoperating instructions for individual items of equipment, where
necessary, will be found in the respective commercial equipment manuals provided with the shelter.
i.
Prestart Procedure.
NOTE
Power to the shelter unit can be provided by commercial power or portable
generator set.
(1)
Set all circuit breakers in main power service box to OFF position.
WARNING
DEATH or serious injury could result if electrical precautions are not taken when
maintaining this equipment.
Be sure that power cables are unplugged/
disconnected, that circuit breakers are set to OFF and that generator cables are
unplugged/disconnected. Be sure that the generator/commercial power system is
properly grounded. Always have another person standing by who is familiar with
electrical shock first aid.
(2)
Connect the main power cable to the main power receptacle located near the door of the shelter, prior
to connecting the cable to the power source. The cable connector and the receptacles are keyed to ensure proper
connection.
(3)
If setting up the Editorial Shelter for use with the Modular Printing System (MPS), refer to TM 5-3610-
294-13&P for connection of the power cable to the power distribution box.
(4)
Notify Module C supervisor that electrical connections are complete and power is required.
2-23

Privacy Statement - Press Release - Copyright Information. - Contact Us