ASSEMBLY AND PREPARATION FOR USE - continued
Up
TM-5-3610-295-13-P-1 Printing Plant Special Warfare Transportable NSN: 3610-01-106-2276 Editorial and Photochemical Shelter NSN: 3610-01-165-5688 Manual
Next
ASSEMBLY AND PREPARATION FOR USE - continued

TM 5-3610-295-13&P-1
2-14.
ASSEMBLY AND PREPARATION FOR USE. - Continued
d.
Unpacking. - Continued
NOTE
Many pieces of equipment are modified to include shipping brackets, holddown
brackets, or thumbscrews. These devices are used to secure fragile or loosely
mounted items such as the glass tops of the light tables. These devices are
painted bright red and are not to be discarded during unpacking. These devices
will be used each time the shelter is moved to a new work site.
(3)
Remove tiedown straps which secure smaller items of equipment inside shelter.
(4)
Remove paper or other packing material from cables, etc.
WARNING
DEATH or serious injury could result by repeated and/or prolonged breathing
and/or skin contact of drycleaning solvent P-D-680.  Use in a well-ventilated
area. Do not use near open flame or in excessive heat. The flash point of this
solvent is 100 ° - 138 ° (38 ° - 59 ° ).
F
F
C
C
(5)
Remove preservative compound from all unfinished metal surfaces with drycleaning solvent (item 17,
app E).
e.
Checking Unpackaged Equipment.
(1)
Inspect the equipment for damage incurred during shipment. If the equipment has been damaged,
report the damage on DD Form 6, Packaging Improvement Report.
(2)
Check the equipment against the packing slip to see if the shipment is complete.
Report all
discrepancies in accordance with the instructions of DA Pam 718-750.
f.
Installation Instructions. The Editorial Shelter is installed for operation on the bed of a 2 1/2 ton cargo truck.
The interior items of equipment in the Editorial Shelter are usually transported intact in their operating positions and no
installation procedures are deemed necessary. Several exterior items must be installed as described below.
2-18