Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-14. PREPARATION FOR MOVEMENT. -Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
2-14.  PREPARATION FOR MOVEMENT
Up
TM-5-3610-294-13P Modular Printing System (MPS) Module C Press Section of the Army Special Warfare Modular Printing System Manual
Next
Figure 2-16.  Finishing Section Equipment Storage Location

TM 5-3610-294-13&P 2-14.  PREPARATION FOR MOVEMENT. -Continued g. Secure all cabinet and storage compartment doors. h. Unplug  electrical  cords  of  the  ceiling  fluorescent  light  assemblies  in  the  expanded  sections  of  the  shelter. Remove light assemblies by depressing the safety release button, sliding the light assemblies in their overhead storage locations in the center section of the shelter, secure with red safety release brackets, and secure their electrical cords in their storage clips. NOTE Each  equipment  item  to  be  stowed  in  the  shelter  center  section  is  marked  with  a  colored  dot.    There  is  a corresponding colored dot on the shelter ceiling and floors.  Items are to be stored in the order listed below by matching the colored dot on the equipment with its matching colored dot in the floor and ceiling of the shelter center section. i .Refer to Figure 2-16 and stow equipment in the following order. (1) Roll up floor mat and place in storage location, and place cover on paper cutter. (2) Place the folding chair with the white dot in position over the white dot on the shelter floor. (3) Place the office cabinet with yellow dot in position over the yellow dot on the shelter floor. (4) Place  the  two-shelf  table  with  black  dot  on  top  of  the  paper  storage  rack  with  green  dot,  and  under  the black dot in the shelter ceiling. (5) Place paper storage rack with green dot in position over green dot on shelter floor. 2-29