Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-14. PREPARATION FOR MOVEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-15.  Power Distribution Box Controls and Indicators
Up
TM-5-3610-294-13P Modular Printing System (MPS) Module C Press Section of the Army Special Warfare Modular Printing System Manual
Next
2-14.  PREPARATION FOR MOVEMENT. -Continued

TM 5-3610-294-13&P 2-13.  ASSEMBLY AND PREPARATION FOR USE. -Continued (13) Place  all  circuit  breakers  and  switches  on  the  Power  Distribution  Panel  inside  the  shelter  in  the  ON position. (14) Place ON/OFF switch on emergency light in ON position. (15) Install flexible duct between air conditioner assembly vent and rear shelter wall. (16) Verify  that  cargo  door  vent  assemblies  are  open  and  energize  air  conditioner  units  and  set  controls (Heating or Cooling) to desired positions. (17) Refer to TM 5-3610-299-12&P Paper Cutter Operations and Maintenance manual and energize the Paper Cutter. 2-14.  PREPARATION FOR MOVEMENT. WARNING Never connect or disconnect any power cables when electrical power is energized to the cables.  Failure to do so will result in damage to equipment and/or serious injury or DEATH to personnel. a. Place all ON/OFF power switches on all operating equipment in the shelter in the OFF position. b. Place all circuit breakers and switches on the Power Distribution Panel in the shelter in the OFF position. c. Notify personnel in all shelters that power will be shut off, and place main circuit breaker on Power Distribution Box in OFF position. d. Notify generator operator to shut down power source and disconnect and stow power cable. e. Disconnect power cable between the Power Distribution Box Assembly and the Finishing Section shelter.  Roll power cable and place in storage compartment behind cargo doors under AC units.  Stow power distribution box in storage location next to islatrol control box.  Disconnect grounding rod wire, remove grounding rod, and stow in storage rack. f. Return all tools, and materials and other small items to their proper storage locations. 2-28

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing