Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-14. Power Cable Connections to Finishing Section Shelter
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
ASSEMBLY AND PREPARATION FOR USE. -Continued
Up
TM-5-3610-294-13P Modular Printing System (MPS) Module C Press Section of the Army Special Warfare Modular Printing System Manual
Next
Figure 2-15.  Power Distribution Box Controls and Indicators

TM 5-3610-294-13&P 2-13.  ASSEMBLY AND PREPARATION FOR USE. -Continued (6) Connect power cable to Finishing Section Receptacle (2) on the power input panel of the shelter.  (Refer to Figure 2-14 for location of receptacle.) (7) Request generator operator to energize power source. CAUTION Do not set main circuit breaker CB1 to ON if voltage is below 110 Vac or above 120 Vac on each phase (A, B, or C). Do not set main circuit breaker CB1 to ON if incorrect phase lamp lights on any phase.  Do not set main circuit breaker CB1 to ON unless frequency is 60 ±  1.0 Hz on each phase. Damage to equipment will result if the above items are not within tolerance.  Notify generator operator. (8) Read voltmeter (3) on Power Distribution Box control panel.  Voltmeter must read between 110 and 120 Vac  on  phases  A,  B,  and  C.    (Refer  to  Figure  2-15  for  location  of  controls  and  indicators  on  Power Distribution Box.) Figure 2-14.  Power Cable Connections to Finishing Section Shelter 2-26