Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ASSEMBLY AND PREPARATION FOR USE. -Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-13.  Ceiling Light Assemblies, Stored Location (View Looking up at Ceiling)
Up
TM-5-3610-294-13P Modular Printing System (MPS) Module C Press Section of the Army Special Warfare Modular Printing System Manual
Next
Figure 2-14.  Power Cable Connections to Finishing Section Shelter

TM 5-3610-294-13&P 2-13.  ASSEMBLY AND PREPARATION FOR USE. -Continued (9) Remove  cover  and  refer  to  TM  5-3610-299-12&P,  Paper  Cutter  Operation  and  Maintenance  manual  for setup instructions for the paper cutter. d. Connecting Power to Shelter and Power Distribution Box. (1) Remove power distribution box from storage location next to islatrol control box and position in accordance with Figure 2-11 site layout. (2) Remove power cables from storage under air conditioners. WARNING Do not set main circuit breaker CB1 power distribution box to ON position until all shelters have been properly connected to the power distribution box.  Module C supervisor is the only person authorized to set main circuit breaker CB1 on power distribution box to ON position.  Failure to do so may result in DEATH or serious injury. CAUTION Make sure that the main circuit breaker in the Power Distribution Box is in the OFF position before connecting the power cable to the Distribution Box or Shelter.  Failure to do so may result in electrical short and damage to equipment. NOTE The generator operator will connect the main power cable from the generator set to the Power Distribution Box Assembly. (3) Install grounding rod.  Connect grounding rod wire to lug (1) on power input panel of the shelter.  (Refer to Figure 2-14 for location of grounding rod wire lug.) (4) Set main circuit breaker CB1 (1) on the Power Distribution Box in the OFF position.  (Refer to Figure 2-15 for location of controls and indicators on Power Distribution Box.) (5) Connect  power  cable  to  the  Finishing  Section  receptacle  (2)  on  the  Power  Distribution  Box.    (Refer  to Figure 2-15 for location of receptacle.) 2-25

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing