Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR MOVEMENT. Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
2-15.  PREPARATION FOR MOVEMENT.
Up
TM-5-3610-293-13P Modular Printing System (MPS) Module B Press Section of the Army Special Warfare Modular Printing System Manual
Next
Figure 2-19.  Press Section Equipment Storage Location

TM 5-3610-293-13&P 2-15.  PREPARATION FOR MOVEMENT.  Continued For   each   equipment   item   with   transporter,   raise   equipment   with   transporters,   move   to storage location, lower to floor, and secure with retainer bolts. i. Refer to Figure 2-19 and stow equipment in the following order. (1)   Roll up floor mat and place in storage location. (2)   Place ink cart and tool caddy with black dot in position over black dot on shelter floor. (3)   Place the GTO Cabinet Assembly with red dot beside the ink cart and tool caddy with red dot, and under the red dot in the shelter ceiling. (4)   Place the work transfer cart with the yellow dot in position over the yellow dot on the shelter floor. (5)   Drain the sink assembly storage tanks and place the sink assembly with blue dot in position over the blue dot on the shelter floor. (6)   Place paper jogging cabinet assembly with brown dot in position over the brown dot on the shelter floor. (7)   Stow roller wash racks under folding table, unlatch braces, and fold down folding table. (8)   Place  stools,  tool  box  and  waste  can  in  storage  locations  shown  in  Figure  2-19  and  secure  in  place  with stretch cords. j. Disconnect passageway tents between the Press Section Shelters and the Finishing Section Shelter.  Refer to TM 10-5411-203-13 for disassembly procedures. k. Strike the Press Section Shelters.  Refer to TM 10-5411-200-14 for striking procedures. 2-41

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing