Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ASSEMBLY AND PREPARATION FOR USE. - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-15.  Ceiling Light Assemblies, Stored Location, View Looking up at Ceiling
Up
TM-5-3610-293-13P Modular Printing System (MPS) Module B Press Section of the Army Special Warfare Modular Printing System Manual
Next
Figure 2-16.  Power Cable Connections to Press Section Shelter

TM 5-3610-293-13&P 2-14.  ASSEMBLY AND PREPARATION FOR USE. - Continued (9) Refer to TM 5-3610-304-10 for setup instructions for the printing press. d. Connecting Power to Shelter and Power Distribution Box. CAUTION Make  sure  that  the  main  circuit  breaker  in  the  Power  Distribution  Box  is  in  the  OFF position before connecting the power cable to the Distribution Box or Shelter.  Failure to do so may result in electrical short and damage to equipment. NOTE The generator operator will connect the main power cable from the generator set to the Power Distribution Box. (1) Install grounding rod. (2) Verify  that  main  circuit  breaker  CB1  (1)  on  the  Power  Distribution  Box  is  in  the  OFF  position.    Refer  to Figure 2-17 for location of controls and indicators on Power Distribution Box and phase monitor meter. (3) Connect grounding rod grounding line to shelter ground lug (1, Figure 2-16).  Connect power cable to the Press  Section  receptacle  (2,  Figure  2-17)  on  the  Power  Distribution  Box  and  to  the  Press  Section  shelter  power  input receptacle (2, Figure 2-16). (4) Notify Module C operator that you have completed connecting your shelter to the Power Distribution Box. Wait  until  Module  C  supervisor  has  set  main  circuit  breaker  CB1  on  Power  Distribution  Box  to  ON  position  before performing step (5). 2-33

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing