Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-14. ASSEMBLY AND PREPARATION FOR USE. - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-12.  Site Layout
Up
TM-5-3610-293-13P Modular Printing System (MPS) Module B Press Section of the Army Special Warfare Modular Printing System Manual
Next
Figure 2-13.  Operating Location of Press Section Equipment

TM 5-3610-293-13&P 2-14.  ASSEMBLY AND PREPARATION FOR USE. - Continued NOTE The solar bar levers on the rear end of the shelter have been removed due to lack of clearance at the air conditioner housing.  A ratchet wrench is supplied for use in rotating the solar bar and is stowed inside the cargo door on the 36,000 BTUH air conditioner side. b. Setup of Shelter.  Refer to TM 10-5411-200-14 for detailed instructions for setting up the shelter. c. Press Section Interior Equipment.  Refer to Figure 2-13 for a typical location of Press Section equipment when setup  for  operation.    Remove  the  equipment  from  the  center  section  of  the  shelter  in  the  order  listed  below  using  T- handle retainer wrench located to the right of the personnel door to remove retainer bolts.  Store retainer bolts in proper location on transporter assemblies. NOTE Equipment  stored  in  the  center  section  of  the  shelter,  with  the  exception  of  the Printing Press, may be placed anywhere within the shelter. 2-29

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing