Click here to make tpub.com your Home Page

Page Title: Table 3-1 . Organizational Preventive Maintenance Checks and Services Semiannual Schedule - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 3-1 . Organizational Preventive Maintenance Checks and Services Semiannual Schedule - continued
Up
TM-11-7025-210-23 Line Printer RP-273/MYQ-4 Manual
Next
Table 3-1 . Organizational Preventive Maintenance Checks and Services Semiannual Schedule - continued

TM 11-7025-210-23
Table 3-1 . Organizational Preventive Maintenance Checks
and Services Semiannual Schedule -- Continued
Item
Item To Be
Equipment Will Be
No.
Inspected
Procedures
Reported Not Ready/
Available if
5
Print Mechanism
Check photocell condition.
Photocell dirty or
Photocell
Clean, if necessary, as
moist.
follows:
1. Lift up platen latch on
each side of frame.
2. Grasp platen. First
lift right end a little,
then sideways a little.
3. Lift platen out.
4. Using a squeezeball blower,
blow dust away from
photocell.
5. Remove moisture with clean
cotton swab.
Check adjustment of photocell
as follows:
1. Run self-test.
Self-test indicates
print alinement
failure.
2. Using horizontal reference
scale, check print aline-
ment.
6
Print Mechanism
Check adjustment of front belt
Belt guide improperly
Front Belt
guide as follows:
alined with print
Guide
belt.
1. Remove ribbon cartridge.
2. Using feeler gauge, check
clearance between belt
guide and ribbon. It
should measure 0.050-
0.070 in. (1.3 to 1.8 mm).
3-5

Privacy Statement - Press Release - Copyright Information. - Contact Us