Click here to make tpub.com your Home Page

Page Title: Table 3-1 . Organizational Preventive Maintenance Checks and Services Semiannual Schedule - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 3-1 . Organizational Preventive Maintenance Checks and Services Semiannual Schedule
Up
TM-11-7025-210-23 Line Printer RP-273/MYQ-4 Manual
Next
Table 3-1 . Organizational Preventive Maintenance Checks and Services Semiannual Schedule - continued

TM 11-7025-210-23
Table 3-1 . Organizational Preventive Maintenance Checks
and Services Semiannual Schedule -- Continued
Item
Item To Be
Equipment Will Be
No.
Inspected
Procedures
Reported Not Ready/
Available if
2
Print Mechanism
Lubricate left jackshaft bear-
Bearing binds.
Bearings
ing by applying two drops of
oil to bearing between jack-
shaft pulley and side frame.
Lubricate right jackshaft
Bearing binds.
bearing by applying two drops
of oil on jackshaft next to
end of bearing on outside of
side frame.
3
Print Mechanism
Check adjustment of jackshaft
Jackshaft is not
Jackshaft
as follows:
properly adjusted.
1. Using feeler gauge, check
left jackshaft end play.
It should be 0.003-0.008
in. (0.08-0.20 mm) between
outside edge of left jack-
shaft bearing and left
pulley assembly.
2. Using feeler gauge, check
right jackshaft end posi-
tion. It should be flush
to 0.06 in. (1.5 mm)
beyond outside edge of
pulley.
4
Print Mechanism
Check tension of left and
Drive Belts
right drive belts.
1. Using belt tension gauge,
apply a force of 4 oz. to
center of belt span.
2. Using a machinist's rule,
measure deflection caused
by force. It should
measure between 0.05 and
0.23 inches.
3-4

Privacy Statement - Press Release - Copyright Information. - Contact Us