Figure 1-18. Intercom and wire raceway system.
Up
TM-11-6780-225-12 Darkroom Photographic Transportable ES-82A Manual
Next
Checking Unpacked Equipment

TM 11-6780-225-12
CHAPTER 2
INSTALLATION AND OPERATION
Section I. SERVICE UPON RECEIPT OF EQUIPMENT
2-2. Unpacking
2-1. Siting
WARNING
CAUTION
After unpacking boarding ladder,
The darkroom may be positioned by
cable adapter, ground rod and strap,
using a forklift.  Forklift slots are
power cables, water hoses, and float,
located curbside and roadside (fig.
make certain that the three holddown
5-1). Make certain that the forks pass
rings are removed from the darkroom
completely under the darkroom and
extend through the three skids. The
darkroom may also be towed by
attaching cables to the tow rings.
a. Remove the lock (fig. 5-1), unlock and open the
entrance door.
a. Ground.
The darkroom site must be firm
ground,  reasonably  level,  with  good  drainage
b. Remove the toolkit (fig. 5-2).
characteristics to carry off water waste. The darkroom
must be located within 40 feet of water, drain, and
c. Remove the air-conditioner covers (fig.  5-1),
electric power connections. The curbside must face the
and covers from the print processors and enlargers.
prevailing wind, so that the exhaust gas from the space
heater blows away from the darkroom. During summer
d. Remove the cover from the 5-gallon fuel can
operation, select a shaded site to decrease the solar
and dust cap from fuel strainer (fig. 1-13).
load on the air conditioners.  The darkroom may be
leveled by inserting screwjacks under the jack pads.
The darkroom shall be checked with a spirit level in both
e. Unbolt and remove the easels (fig. 5-2).
the vertical and horizontal planes. If a spirit level is not
available, fill the large compartment of the processing
f. Unbolt the processing rack assemblies.
sink with water until the water level is adjacent to the
bottom of the small tank holder (TM 11-6740-286-12).
When the darkroom is level, the water will be evenly
g. Unbolt the cover from the diffusion transfer
distributed over the top surface of the small tank holder
equipment storage box.
(without small developing tanks).  The site must be
convenient to airdrop or messenger service.  If an
h. Unlock storage drawers 1 through 8 and the file
external source of water not under pressure is to be
cabinet drawers.
used, choose a site for the darkroom within 40 feet and
on the same level as the water source. The darkroom is
i. Unstrap and remove the boarding ladder, cable
equipped to lift a column of water to a maximum height
adapters, ground rod and strap, power cables, water
of 15 feet below the level of the water pump.
hoses, and float (fig. 1-11). Refer to paragraph 24d for
cable adapters and power cables required.
WARNING
Make certain that escape door will
j. Unstrap and remove the wastebasket and 3-
always  open  when  darkroom  is
gallon mixing pail (fig. 5-2).
secured to truck.
k. Unstrap the Ditto machine carrying case and
b. Vehicle. The darkroom is normally used when
typewriter. Remove the 12-inch safety trimmer.
mounted on a truck (fig.  5-1).  The darkroom is
equipped with four lifting rings.  The lifting rings with
sling assembly (fig. 2-1) provide the facility for loading
I. Remove the equipment stowed in the sink (fig.
and off-loading. Folding steps (fig. 5-1) provide access
to the roof of the darkroom. Refer also to paragraph
311n or securing the darkroom to a truck.