Click here to make tpub.com your Home Page

Page Title: Section II. SECOND ECHELON PREVENTIVE MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Optical Surfaces
Up
TM-11-2330A Still Picture Projector AP-5 (1) Manual
Next
Monthly Preventive Maintenance Checks and Services Chart

TM 11-2330A C2
(4) Dry the cleaned surface of the mirror with a fresh lens
tissue.
Add section 2 (page 10 of C 1) :
Section II
SECOND ECHELON PREVENTIVE MAINTENANCE
27. Scope of Second Echelon Maintenance
The maintenance duties assigned to the second echelon mainte-
nance personnel of the equipment are listed below together with a
reference to the paragraphs covering the specific maintenance
functions.
a. Monthly preventive maintenance checks and services (par. 29.2).
b. Quarterly preventive maintenance checks and services (par.
29.4) .
c. Troubleshooting (pars. 32 and 43).
28. Tools, Materials, and Test Equipment Required
In addition to the tools and materials listed in paragraph 21, the
following items are required.
a. Tool Kit, Photographic Repair TK-77/GF.
b. Sandpaper (No. 000).
c. Lubricating Oil, General Purpose, Light (LO) (FSN 9150-261­
8146) .
d. Multimetar AN/URM-105.
29. Second Echelon Preventive Maintenance
a. Second echelon, preventive maintenance is the systematic care,
inspection, and servicing of equipment to maintain it in serviceable
condition, prevent breakdowns, and assure maximum operational
capability. Preventive maintenance is the responsibility of all eche-
lons concerned with the equipment and includes the inspection, test-
ing, and repair or replacement of parts, subassemblies, or units that
inspection and tests indicate would probably fail before the next
scheduled periodic service. Preventive maintenance checks and serv-
ices of the equipment at the second echelon level are made at monthly
and quarterly intervals unless otherwise directed by the commanding
officer.
b. Maintenance forms and records to be used and maintained on this
equipment are specified in TM 38-750.
TAGO 6432B
8

Privacy Statement - Press Release - Copyright Information. - Contact Us