| ||||||||||
|
|
![]() ![]() TM 11-2330A C2
24. Daily Preventive Maintenance Checks and Services Chart
Procedure
References
Item
Sequence
No.
Pars. 4 or 4.1.
Check to see that all items re-
1
Completeness_____
quired for operation are avail-
able.
Par. 26a.
Clean all exterior surfaces of
2
Cleanliness_________
equipment (except optical sur-
faces).
Par. 26a.
Inspect ventilating louvers on
3
Ventilation_________
sides and top of projector
housing (fig. 2 or 2.1) to see
that they are clean and free of
any obstructions to free circu-
lating air.
Examine knobs, levers, and han-
4
Controls ______
dles of controls (fig. 5 or 5.1)
for bent, broken, and dam-
aged parts. Control knobs,
levers, and handles must be
firmly secured.
Inspect all components for loose
5
Hardware ______
or missing screws, nuts, and
bolts.
During operation; be alert for
6
Operation_________
any unusual operating condi-
tions.
Note. If the projector is not used daily,
the projection lamp and the blower should
be turned on for about 10 minutes to pre-
vent moisture from accumulating in the
equipment.
25. Weekly Preventive Maintenance Checks and Services Chart
References
Procedure
Item
Sequence
No.
a. Par. 26 b.
a. Clean projection lens (fig. 5
1
Projector ---------
or 5.1).
b. Par. 26 c.
b. Inspect front surface mirror
(fig. 13); do not clean unless
absolutely necssary.
5
TAGO 6432B
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |