|
| |
Back Figure 4-5. Equipment Receptacle | Up TM-10-3610-203-14 Press Shelter Unit of the Transportable Special Warfare Printing Plant Manual | Next Section VII. RADIO INTERFERENCE SUPPRESSION |
TM 10-3610-203-14
Table 4-2. Troubleshooting ( Contd)
Malfunction
Test or Inspection
Corrective Action
c. Pull receptacle from conduit box and inspect receptacle and wiring connections.
If necessary, replace defective receptacle and secure wiring connections as follows:
(1) Tag and disconnect wires and remove receptacle.
(2) Remove tags and connect wires to new receptacle.
(3) Insert receptacle into conduit.
(4) Position receptacle cover and secure with screws.
(5) Position applicable RECEPTACLES circuit breaker in main power service box to on.
4-19
|