Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 4-2. Troubleshooting - cont
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 4-3.  Water Supply System Plumbing and Fittings
Up
TM-10-3610-203-14 Press Shelter Unit of the Transportable Special Warfare Printing Plant Manual
Next
Figure 4-4.  Fluorescent Lamp Switches

TM 10-3610-203-14 Table 4-2.  Troubleshooting ( Cont’d) Malfunction Test or Inspection Corrective Action Step 2.  Inspect water line between tank and faucet for damage which would prevent water flow. If necessary, replace defective line as follows: a.  Position a suitable container beneath water faucet and open faucet to drain tank. b.  Open draincock (see fig.  4-3). c.  Unscrew the tank-to-faucet water line fitting at the base of the tank. d.  Unscrew the water line fitting immediately below the stand pipe draincock. e.  Unscrew the water line fitting above the faucet and remove damaged line. f.  Position replacement line assembly, carefully bending tube to align fittings. g.  Connect line fitting at faucet union.  Do not tighten at this time. h.  Connect line fittings at water tank base union.  Do not tighten at this time. i.  Connect line fitting to standpipe draincock. j.  Tighten all fittings. k.  Close faucet and draincock. I.  Fill tank with approximately 10 gallons (37.8 liters) of water. m.  Check for water leaks and secure fittings as necessary. 3.  SHELTER LIGHTING COMPONENT FAILURE Step 1.  Inspect for failure of one or more fluorescent tubes. If necessary, replace defective fluorescent tubes as follows: a.  Grasp lamp tube, rotate 90 degrees and lower from sockets. b.  Place replacement lamp below sockets with pins vertical.  Insert lamp into sockets and twist until pins lock. Step 2.  Inspect lamp switches for excessive wear, loose connections and proper operation and switchbox cover for security of mounting. If necessary, replace defective switch as follows: a.  Position the LIGHTS circuit breaker to the off position. b.  Remove the two screws that secure the switchbox cover to the switchbox and remove the cover. (See fig.  4-4.) 4-16

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing