Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Loading For Movement.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 4-1.  Attachment of Lifting Slings
Up
TM-10-3610-203-14 Press Shelter Unit of the Transportable Special Warfare Printing Plant Manual
Next
Figure 4-2.  Rigging Instructions for Transportation of Shelter

TM 10-3610-203-14 (2) Tie a 1/2-inch rope at least 15 feet (4.6 meters) long to each rear shelter towing eye. (3) Position a man on each rope to assist in positioning the shelter during the lifting operation. (4) Lower the truck tailgate and make sure that all tools and equipment have been removed from the truck body. WARNING To  avoid  injury  to  personnel  and  damage  to  equipment,  permit  only  those  individuals  actually engaged   in   the   lifting   operation   to   be   near   the   vehicle   and   the   lifting   device.      Also,   all instructions relative to the lifting operations must come from the crew supervisor. CAUTION Do  not  jerk  the  shelter  when  lifting.    A  pull  greater  than  the  actual  amount  required  to  lift  the shelter will tear the lifting eye assemblies from the shelter. CAUTION Avoid  swinging  the  shelter  from  side  to  side.    The  additional  stress  placed  on  the  lifting  eye assemblies will tear the lifting eye assemblies from the shelter. (5)  Slowly  lift  the  shelter  with  the  crane  or  helicopter,  to  a  position  just  high  enough  to  clear  the  body  of  the transportation vehicle.  The unit may be transported to the new operating site by helicopter if necessary. WARNING All personnel must remain clear of the truck while the assemblage is being lowered into position. CAUTION Do not bounce or jar the shelter.  Bouncing or jarring can loosen the bond between the skin and foam-core and reduce the rigidity and strength of the shelter. (6) Back the truck into position under the assemblage and using the towing eye ropes to guide the assemblage into position, slowly lower it onto the truck body. (7) Remove the lifting ring from the lifting hook and disassemble the lifting ring and sling hooks.  Remove the sling center hooks from the lifting eyes and the 1/2-inch ropes from the rear towing eyes. NOTE Tiedown procedures are identical for each side of the shelter. (8) Install the tiedown ring assembly (see fig.  4-2) above the center support on the cargo bed siderail of the truck. 4-4