Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 4-1. Attachment of Lifting Slings
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Section II.  MOVEMENT TO A NEW  WORKSITE
Up
TM-10-3610-202-14 Editorial and Photochemical Shelter Unit The Transportable Special Warfare Printing Plant Manual
Next
Loading   For   Movement

TM 10-3610-202-14 Figure 4-1.  Attachment of Lifting Slings (2) Tie  a  1/2-inch  rope  at  least  15  feet  (4.6 meters) long to each rear shelter towing eye. (3) Position  a  man  on  each  rope  to  assist  in positioning the shelter during the lifting operation. (4) Lower  the  truck  tailgate  and  make  sure that  all  tools  and  equipment  have  been  removed  from the truck body. WARNING To  avoid  injury  to  personnel  and damage to equipment, permit only those individuals actually engaged in the lifting operation to be near the vehicle and the lifting device.        Also,    all    instructions relative   to   the   lifting   operations must come from the crew supervisor. CAUTION Do    not    jerk    the    shelter    when lifting.      A   pull   greater   than   the actual  amount  required  to  lift  the shelter   will   tear   the   lifting   eye assemblies from the shelter. CAUTION Avoid  swinging  the  shelter  from side to side.  The additional stress placed on the lifting eye assemblies will tear the lifting eye assemblies from the shelter. 4-3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing