Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. TROUBLESHOOTING
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Table 3-1. Operator/Crew Preventive Maintenance Checks and Services - cont
Up
TM-10-3610-202-14 Editorial and Photochemical Shelter Unit The Transportable Special Warfare Printing Plant Manual
Next
Section III.  TROUBLESHOOTING - cont

TM 10-3610-202-14 Section III.  TROUBLESHOOTING 3-5.  General. a. This section contains troubleshooting information   for   locating   and   correcting   most   of   the operating  troubles  which  may  develop  in  the  editorial and photomechanical unit of the special warfare printing plant.    Each  malfunction  for  an  individual  component, unit,    or    system    is    followed    by    a    list    of    tests    or inspections  which  will  help  you  to  determine  corrective actions to take. You should perform the tests/inspections   and   corrective   actions   in   the   order listed. b. This   manual   cannot   list   all   malfunctions   that may  occur,  nor  all  tests  or  inspections  and  corrective actions.  If a malfunction is not listed or is not corrected by listed corrective actions, notify your supervisor. 3-6.  Troubleshooting. Refer  to  table  3-2  for  troubleshooting  information and procedures applicable to the editorial and photomechanical shelter system and components.  Any trouble,  the  correction  of  which  is  beyond  the  scope  of the operator/crew, should be re ported to the maintenance    echelon    indicated    in    the    Maintenance Allocation Chart (MAC) Table 3-2.  Troubleshooting MALFUNCTION TEST OR INSPECTION CORRECTIVE ACTION SHELTER SYSTEM AND COMPONENTS 1.  NO ELECTRICAL POWER TO SHELTER SYSTEM Step 1.  Inspect to see that generator is operating properly,. Start the generator set in accordance with the applicable technical manual. Step 2.  Check that main power cable is correctly connected at main proper receptacle. WARNING Do not perform any electrical maintenance or make any electrical connection or disconnection at the main power receptacle while the generator set engine is running.  Connect the primary power cable to the input power receptacle located near the door of the shelter.  The cable connector and the receptacles are keyed to ensure proper connection. Step 3.  Check to see if the main power cable leads are properly connected at generator. The leads of the power cable are color coded as follows : Phase A black Pin 1 Phase B red Pin 2 Phase C green Pin 3 (marked with blue band) Neutral white Pin 4 Step 4.  Inspect to see if main circuit breaker is in the on position. Position the applicable circuit breaker to on. 2.  NO ELECTRICAL POWER AT EQUIPMENT RECEPTACLES. Inspect to see if the proper circuit breaker is in the on position. Position applicable circuit breaker to on. 3-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing