| ||||||||||
|
|
![]() ![]() TM 9-1370-201-12
Figure 2-10. Loading gate installed (after loading of flares).
(8) When dispenser assembly has been loaded to
capacity (24 flares), replace loading gate by setting gate
on support pins and closing latch (fig. 2-10).
2-11
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |