Click here to make tpub.com your Home Page

Page Title: Inspection Procedure (90-120-Day Inspection) (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Inspection Procedure (90-120-Day Inspection)
Up
TM-5-4220-201-12 Life Preserver Underarm Parachutist Type B-7 Coinflated FSN 4220- 657-2197 Manual
Next
Inspection Procedure (90-120-Day Inspection) (Cont)

TM 5-4220-201-12
WARNING
Do not submerge the mouth inflation valve
in water or allow water to enter the flotation
cell.
c. Keep the cells inflated for a minimum of 12 hours.
Record the room temperature and cell pressure at this time.
For each 1 degree rise in temperature, add 0.031 psi to the
final pressure reading.
For each 1 degree drop in
temperature, subtract 0.031 from the final pressure reading.
Cells having a corrected pressure of not less than 1.0 psi
are satisfactory for use. If cells show a marked decrease in
psi reinflate to 2 psi and check for leaks. If leaks cannot be
located, coat with a soap solution or submerge in a water
tank and observe clearly for bubbles.
d. Remove the cylinder and deflate the cells after they
have passed the inflation test. Check the cylinder valve for
proper operation and make sure gaskets (fig.  2-7) are
installed. Return the valve discharge lever (fig. 4-1) to the
closed position.
e.  Check CO2 cylinder weight before reinstallation.
Scales calibrated in grams may be used for weight-checking
the cylinders. Remove from service and condemn cylinders
weighing less then the gross weight marked on the cylinder.
f. Upon completion of the periodic inspection and test,
mark the inspection date on each cell.
4-3

Privacy Statement - Press Release - Copyright Information. - Contact Us