Click here to make tpub.com your Home Page

Page Title: ASSEMBLING THE RESERVE CANOPY ASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 23. Making Girth Hitch Securing USL Extension to Static Line.
Up
TM-10-1670-327-23-P MC-6 Personnel Parachute System NSN 1670-01-527-7537 Manual
Next
Figure 2. Assembling the Ejector Spring.

TM 10-1670-327-23&P
UNIT MAINTENANCE
MC-6 PERSONNEL PARACHUTE SYSTEM
NSN 1670-01-527-7537
ASSEMBLING THE RESERVE CANOPY
ASSEMBLY
INITIAL SETUP:
Tools
Personnel Required
Knife (Item 26, WP 0097 00)
92R (10) Parachute Rigger
Needle, Tacking (Item 32, WP 0097 00)
Rod, Compression, Ejector Spring (Item 46, WP
Wrench, Adjustable, 8-inch (Item 71, WP 0097
Materials/Parts
Equipment Condition
Cord, Spectra®, #1000 (Item 19, WP 0109 00)
All equipment shall be serviceable and ready for
Tape, Lacing And Tying, Nylon, (Item 42, WP
use.
Webbing, Cotton, 80 lb (Item 53, WP 0109 00)
ASSEMBLY
Assemble Reserve Pack Tray
Place two large retainer bands (figure 1, item 1) per retainer stow bar (figure 1, item 2).
2
1
Figure 1. Assembling the Reserve Pack Tray.
0007 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us