Click here to make tpub.com your Home Page

Page Title: Figure 16. Securing Static Line to D-bag.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 15. Passing Loop End of USL Through Buffer Loop.
Up
TM-10-1670-327-23-P MC-6 Personnel Parachute System NSN 1670-01-527-7537 Manual
Next
Figure 19. Passing Top of Snap Hook Through Loop End of Static Line.

TM 10-1670-327-23&P
0006 00
c.
Secure the static line (figure 16, item 1) to the deployment bag (figure 16, item 2).
2
1
Figure 16. Securing Static Line to D-bag.
2. Attach the snap hook to the Modified USL, or the USL extension as follows:
a. Position the snap hook (figure 17, item 1) so the opening gate (figure 17, item 2) is facing left.
Lay the static line (figure 17, item 3) flat on the packing table. Ensure that the green ID marking
thread (figure 17, item 4) is on top and on the outside of the loop.
1
2
3
4
Figure 17. Positioning Static Line and Snap Hook.
b. Pass the 3½-inch loop end (figure 18, item 1) of the static line (figure 18, item 2) through the
opening (figure 18, item 3) in the base of the snap hook (figure 18, item 4), from bottom to top.
1
3
2
4
Figure 18. Passing Loop End of Static Line Through Base of Snap Hook.
0006 00-14

Privacy Statement - Press Release - Copyright Information. - Contact Us