Click here to make tpub.com your Home Page

Page Title: RECEIPT OF USED PARACHUTE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 19. Spring Compression Test Tube.
Up
TM-10-1670-327-23-P MC-6 Personnel Parachute System NSN 1670-01-527-7537 Manual
Next
ASSEMBLING THE MAIN CANOPY ASSEMBLY

TM 10-1670-327-23&P
0005 00
RECEIPT OF USED PARACHUTE
Upon initial receipt of used parachute, proceed as follows:
1. Follow procedures given in the General Procedures for Air Delivery Equipment paragraph, above, and
check each component for excessive wear and tear.
2. If defects or damages are discovered, process the parachute for maintenance at the maintenance
level assigned by the Maintenance Allocation Chart (MAC), WP 0097 00.
AFTER-USE RECEIPT
When a parachute is received at the maintenance activity, following its use by the parachutist during air
delivery, it must be given a shakeout and aired (WP 0010 00), and if necessary, cleaned (WP 0011 00)
before it can be returned to service. If a parachute is issued but is not used, it does not need to be given a
shakeout; however, it must be given a routine inspection by a qualified parachute rigger (MOS 92R).
CHECKING UNPACKED EQUIPMENT AFTER SHIPMENT
1. Inspect equipment for damage incurred during shipment. If the equipment has been damaged, report
the damage on a SF 361, Transportation Discrepancy Report (TDR).
2. Check the equipment against the packing slip to see if the shipment is complete. Report all
discrepancies in accordance with the instructions in DA PAM 750-8.
3. Check to see whether the equipment has been modified.
END OF WORK PACKAGE
0005 00-18

Privacy Statement - Press Release - Copyright Information. - Contact Us